1, 2, 3, UP!

The Marquik Instant Shelter is designed to be set-up in less than a minute. The 1,2,3, UP process is simple and effective every time!

 

 

1 shelter1 Remove the carry bag and sock from the folded shelter. Using at least two people, gradually start jostling the corner shelter legs out from the centre.
2 shelter2 Pull the shelter legs out until the shelter has expanded to its full length.
3 shelter 4 Get inside and underneath the shelter. Push the cross arms that join the corner legs, up, until the bracket with pin clicks into the hole in the leg. (You will need to do this to the middle legs if it is a 3x6m).
UP DSCF9461 Extend the legs, pulling the pin bracket out (located halfway down the leg) and pull the inner leg out until the shelter is extended to the desired height level. Attach tent pegs & guy ropes on all four corners of the shelter. Attach sidewalls if necessary.